Ghaenat direct reduction and material handling

Project information

Project name Ghaenat direct reduction and material handling

Client National Iranian Steel Company

Contract type EPC

Launching year Under construction

Location South Khorasan, 40 kilometers North West of Ghaen province

About the project

Goals Establishing the direct reduction unit by Midrex method with the capacity of 800,000 tons per year

Project details National Iranian Steel Company has proceeded to establish a Midrex direct reduction unit with the capacity of 800 thousand tons per year in a contract with the cooperation of IRITEC- Irasco and Iran Offshore Engineering and Construction Company (IOEC) as the cooperation leader. Along with this unit establishment, other facilities like the material handling unit with the capacity of 2.5 million tons per year, sponge iron storage piles, briquette making unit, voltage reduction post, water purification and cooling system, executing gas and water supply lines will be designed and carried out. All activities regarding basic engineering and most of the detail engineering of this unit will be carried out based on the know-how existing in IRITEC and its design& construction experiences in similar projects.

Total 0 Votes
0

Tell us how can we improve this post?

+ = Verify Human or Spambot ?

SWITCH THE LANGUAGE